Skip to content
casepemetal.ro

Frequently asked questions

Money

What does the price include?

The steel frame, the exterior envelope, the insulation, the complete roof, the joinery, the doors, the electrical and plumbing installations, the underfloor heating, all interior finishes, the exterior ceramic cladding, transport and assembly. The full list is on the prices page.

see the price per square metre →

What does the price not include?

The foundation and the geotechnical survey, the building permit and the related fees, utility connections, landscaping and fencing, furniture and appliances. This list is published just as visibly as the list of what is included.

see the price per square metre →

Permits and land

Do I need a building permit?

Yes. A light-gauge steel frame house is a building and is permitted like any other. The permit, the permit design and the fees are not included in the price and are obtained before assembly begins.

see the process step by step →

Who builds the foundation?

You can build it yourself or we can build it, as a separate option. Either way the foundation follows our drawing. If you build it yourself, we inspect it before delivery. It is the most common source of delays.

see the process step by step →

What if the plot is on a slope?

The slope is resolved in the foundation, not in the frame. The cost of the foundation rises with the slope, and the geotechnical survey becomes mandatory for sizing. We check the slope and the access at the site visit.

see the process step by step →

Build

How long does it take?

Between 105 and 135 days from signing the contract to handover: 15-45 days of production, 45 days of transport and 45 days of assembly.

see the process step by step →

Is it earthquake resistant?

The frame is designed and manufactured to measure, with CE marking and a declaration of performance. A light-gauge steel frame has far less mass than masonry, and seismic forces are proportional to mass.

see the build-ups →

Can the plan be changed?

Yes. The frame is designed and manufactured to measure for each house, so the layout is not fixed. Changes are agreed before the contract, because they go into the execution design.

see the models with plans →

Do you also build outside Romania?

Yes. In Romania transport and assembly are included in the price. Elsewhere in Europe we build on request, and the transport and accommodation of the team are calculated separately and shown explicitly in the quote.

see the price per square metre →

How thick is the exterior wall?

About 275-290 mm, depending on the exterior finish chosen, with two independent structural zones: C140 with 140 mm of wool, then C89 with a further 60 mm of wool and a ventilated cavity behind the cladding. The resulting U-value is 0.18 W/m²K, against the 0.35 W/m²K required by the Romanian code.

see the comparison with masonry →

Did not find your answer?

Send us your question and we will answer directly, without putting you through a sales form.